Bombardier Waste to Energy Plant

  1. Home
  2. Projects
  3. Bombardier Waste to Energy Plant

31,500 m2 extension to an aerospace manufacturing building

Sub-Contractor – Mechanical Building Services Installation

Supply, installation and commissioning of the following services:

  • Water services
  • Soils and Waste services
  • Ventilation and Air Conditioning services
  • Controls Services
  • Gas Services
  • Testing, Commissioning and demonstration
  • Completion of as built drawings and operating and maintenance manuals
Project Details
Value €650k
Handover Date September 2017

Other Projects

Menu